南京长江三桥钢索塔现场拼装测量的关键技术(PDF)

《南京林业大学学报(自然科学版)》[ISSN:1000-2006/CN:32-1161/S]

Issue:
2009年01期
Page:
101-105
Column:
研究论文
publishdate:
2009-01-30

Article Info:/Info

Title:
Technology of the steelpylon’s process assembling survey of Nanjing Third Yangzi River Bridge
Author(s):
WEI Haohan12HE Liheng2SUI Mingming2GUO Shenfan3
1.College of Civil Engineering, Hohai University, Nanjing 210098, China;2.College of Civil Engineering, Nanjing Forestry University, Nanjing 210037, China;3.Nanjing Institute of Surveying Mapping and Geotechnical Investigation Co.Ltd, Nanjing 210005, C
Keywords:
Nanjing Third Yangzi River Bridge steelpylon assembling survey verticality
Classification number :
U445
DOI:
10.3969/j.jssn.1000-2006.2009.01.021
Document Code:
A
Abstract:
Nanjing Third Yangzi River Bridge was the first cable stayed bridge in China. Its main tower was the form of steel structure. The key technology of the steelpylon’s process assembling was investigated to meet the characteristics of the steelpylon’s construction. The method of the control network’s building for assembling survey was introduced. The inner controlling method and the method combined inner controlling and outer controlling were pointed out. Quality evaluation was made for the assembling surveys’s result. The results showed that the survey methods could meet the requirement of design and construction. It could also be a reference for the similar steelpylon’s engineering projectors.

References

[1]郁黎,冯斌.南京长江三桥设计与施工创新概述[J].中国西部科技,2006,31(11):1114.
[2]崔冰,孟凡超,冯良平,等.南京长江第三大桥钢塔柱设计与加工[J].中国铁道科学,2005,26(3):4244.
[3]黄腾,华锡生.灵山大佛精密测绘及质量控制[J].河海大学学报,1998,26(6):3233.
[4]吴迪军,张建军,李书银.复杂特大型桥梁施工控制网的建立与复测[J].工程勘察,2007,25(3):4547.
[5]黄腾,魏浩翰.南京长江三桥主塔基础大型双壁钢套箱施工测量技术[J].工程勘察,2005,23(2):5054.
[6]华锡生,黄腾.精密工程测量技术及应用[M].南京:河海大学出版社,2002.
[7]魏浩翰,郑加柱,王子君,等.夜间江面大气折光系数的变化规律[J].南京林业大学学报:自然科学版,2007,31(3):107110.
[8]Matsuyama Kimitoshi, Ota Shiro, Fujiwara Tetsuro,et al. Study of estimation for figure and damage of a steel pylon foundation[J]. Nippon Koei Technical Forum, 2002,25(10):7784.

Last Update: 2009-05-06