The connecting passage freezing method thaw settlement grouting optimization study in accordance with measured thawing temperature
Article ID:
1000-2006(2017)04-0167-06
Author:
吴 繁1杨 平1*万朝栋2张尚贵2何文龙1
1.南京林业大学土木工程学院,江苏 南京 210037;
2.中铁十八局集团有限公司,天津 300222
Author(s):
WU Fan1YANG Ping1*WAN Chaodong2ZHANG Shanggui2HE Wenlong1
1.College of Civil Engineering,Nanjing Forestry University,Nanjing 210037,China;
2.China Railway 18th Bureau Group Co.,Ltd.,Tianjin 300222,China
Keywords:
联络通道 冻结法 解冻温度场 地面沉降 跟踪注浆 城市轨道交通
Keywords:
connecting passage freezing method thaw temperature field ground subsidence tracing compensation grouting urban rail transit
Classification number :
U45
DOI:
10.3969/j.issn.1000-2006.2017.04.026
Document Code:
A
Abstract:
【目的】冻结法施工中,为了工后跟踪注浆及控制融沉,必须了解地铁联络通道解冻温度发展规律。【方法】以软土隧道联络通道冻结法工程为背景,对解冻温度场、深层土体温度变化规律等进行了实测; 为更有效控制融沉,对其跟踪注浆时机及顺序、注浆工艺及材料进行了优化。【结果】联络通道解冻20 d内,部分土体温度开始达到0 ℃附近,冻土进入相变阶段; 入土深度越大,土体相变阶段持续时间越长; 软土融沉主要发生在解冻前2个月,侧墙及顶部完全解冻需要4个月,则跟踪注浆至少应持续的时间为3~4个月。【结论】控制融沉过程中,注浆应按照由底部→顶部→侧墙的顺序先后进行; 同时要根据实测温度和地面沉降量实行双控标准。合理安排施工顺序和注浆参数,加强监测,可以进一步使得联络通道周边土层受融沉影响范围缩小,降低联络通道顶部受融沉的影响程度。
Abstract:
【Objective】In the construction of freezing method, grasping the development rule of thawing temperature of the subway interconnecting road is the essential for tracking grouting and controlling the thawing settlement after the construction.【Method】With the background of freezing method project of the soft oil subway interconnecting road, the changing rule of the melting temperature field and deep soil temperature etc. are measured; to control the thawing settlement more efficiently, the opportunity and order of tracking the grouting and the grouting process and materials are optimized.【Result】In the 20-day thawing of the connected aisle, the temperature of some soils began to reach near 0 ℃, and the frozen earth entered the phase transition stage; the deeper the embedded depth, the longer the time of the soil phase change. The soft soil thaw settlement mainly appears two months before thawing and the fully thawing of the side wall and the top takes four months, then, 3—4 months is the least time to track grouting.【Conclusion】During the process of controlling the thaw settlement, the grouting should be carried out in the order of the bottom → the top → the side wall. At the same time, the double control standards should be implemented according to the measured temperature and the land subsidence amount. Reasonable arrangement of construction sequence and grouting parameters, as well as the reinforcement of the monitoring, can further reduce the scope of the soil around the connected aisle affected by the thaw settlement and reduce the impact of the top of the connected aisle by the thaw settlement.

References

[1] YU L L, XU X Y, MA C. Combination effect of seasonal freezing and artificial freezing on frost heave of silty clay[J].Journal of Central South University of Technology,2010,17(1):163-168.
[2] CHEN Y L, AZZAM R, WANG M, et al. The uniaxial compressive and tensile tests of frozen saturated clay in Shanghai area[J]. Environmental Earth Sciences,2011, 64(1): 29-36.
[3] 覃伟,杨平,金明,等.地铁超长联络通道人工冻结法应用与实测研究[J].地下空间与工程学报,2010,6(5):1065-1071. DOI:10.3969/j.issn.1673-0836.2010.05.032. QIN W, YANG P, JIN M, et al. Application and survey analysis of freezing method applied to ultra-long connected aisle in metro tunnel [J]. Chinese Journal of Underground Space and Engineering, 2010,6(5):1065-1071.
[4] 曹红林.地铁隧道冻结法施工融沉控制方案及实施[J].地下空间与工程学报,2010,6(2):387-390,395.DOI: 10.3969/j.issn.1673-0836.2010.02.031. CAO H L. Thawing settlement control of subway tunnel construction by artificial ground freezing[J]. Chinese Journal of Underground Space and Engineering,2010,6(2):387-390,395.
[5] 胡向东,赵飞.主隧道结构散热对联络通道冻结效果的影响[J].岩石力学与工程学报,2009,28(S1):3109-3115.DOI: 10.3321/j.issn:1000-6915.2009.z1.077. HU X D, ZHAO F. Influence of heat dissipation of main tunnel structure on freezing effect in cross passage construction[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(S1): 3109-3115.
[6] 肖朝昀, 胡向东.人工地层冻结有限厚度冻土帷幕自然解冻规律[J].华侨大学学报(自然科学版),2010,31(6):674-679. XIAO Z Y, HU X D. Natural thawing of frozen soil with limited thickness by artificial ground freezing[J].Journal of Huaqiao University(Natural Science)2010,31(6):674-679.
[7] 鲍俊安,杨平.水泥土融沉特性的试验研究[J].南京林业大学学报(自然科学版),2013,37(5):97-102.DOI:10.3969/j.issn.100-2006.2013.05.019. BAO J A, YANG P. Experimental study on thaw subsidence properties of cement-improved soil[J].Journal of Nanjing Forestry University(Natural Sciences Edition),2013,37(5):97-102.
[8] 王效宾,杨平,张婷.人工冻土融沉特性试验研究[J].南京林业大学学报(自然科学版),2008,32(4):108-112.DOI: 10.3969/j.issn.1000-2006.2008.04.025. WANG X B, YANG P, ZHANG T. Study on thaw settlement behavior of artificial freezing soil[J]. Journal of Nanjing Forestry University(Natural Sciences Edition), 2008, 32(4): 108-112.
[9] 王效宾.人工冻土融沉特性及其预报模型研究[D].南京:南京林业大学,2006. WANG X B. Artificial permafrost thawing settlement characteristics and its forecasting model[D]. Nanjing:Nanjing Forestry University,2006.
[10] 岳丰田,张水宾,李文勇.地铁联络通道冻结加固融沉注浆研究[J].岩土力学,2008,29(8):2284-2289.DOI: 10.3969/j.issn.1000-7598.2008.08.049. YUE F T, ZHANG S B, LI W Y, et al. Aisle freezing thaw settlement grouting study[J]. Chinese Journal of Geotechnical Engineering, 2008, 29(8): 2284-2289.
[11] 程桦,臧华.人工冻结法在地铁隧道施工中的应用与发展[J]. 工程建设,2007,39(1):30-32. CHENG H, ZANG H.Artificial freezing method in the application and development of metro tunnel construction[J].EngineeringConstruction,2007,39(1):30-32.
[12] 李文勇,石荣剑,张水宾,等.冻结加固融沉注浆作用机理与应用技术[J].徐州工程学院学报,2007,22(6):47-52. LI W Y, SHI R J, ZHANG S B. Freezing thaw settlement grouting mechanism and application of technology[J].Journal of Xuzhou Institute of Technology, 2007, 22(6): 47-52.
[13] KUDRYAVTSEVSA. Numerical modeling of the freezing, frost heaving and thawing of soil[J].Soil Mech Foundation Eng,2004,41(5):21-6.
[14] 王许诺,杨平,鲍俊安,等.冻结水泥土无侧限坑压试验研究[J]. 水文地质与工程地质,2013,40(3):79-83. WANG X N, YANG P, BAO J A. Test research on unconfined compressive strength of freezing cement soil[J]. Hydrogeology & Engineering Geology,2013,40(3):79-83.
[15] 何冬.软土地层人工冻结联络通道融沉控制研究[D]. 南京:南京林业大学,2015. HE D. The research about thawing settlement control of artificial freezing contact channel in soft soil layer[D]. Nanjing: Nanjing Forestry University,2015.

Memo

Memo:
收稿日期:2016-12-01 修回日期:2017-05-25
基金项目:国家自然科学基金项目(51478226); 住房和城乡建设部科学技术项目(2014-k3-029)
第一作者:吴繁(565006198@qq.com)。*通信作者:杨平(yangping@nifu.com.cn),教授。
引文格式:吴繁,杨平,万朝栋,等. 基于实测解冻温度的联络通道冻结法融沉注浆优化研究[J]. 南京林业大学学报(自然科学版),2017,41(4):167-172.