The conversion between different coordinate systems is solved by using coordinate transformation. This would make a fast and concise location survey for road engineering and architectural engineering, breaking through the conventional construction layout. The construction layout is carried out by using a postrotated coordinate system,i. e, a construction coordinate system(H,V).
Tao Jianyue Li Guofen .
THE APPLICATION OF COORDINATE TRANSFORMATION IN ENGINEERING SURVEY[J]. JOURNAL OF NANJING FORESTRY UNIVERSITY. 1997, 21(02): 74-76 https://doi.org/10.3969/j.jssn.1000-2006.1997.02.017