[1] 刘卫东,陆大道,张雷,等.我国低碳经济发展框架与科学基础:实现2020年单位GDP碳排放降低40%~45%的路径研究[M].上海:商务印书馆,2010.
[2] Tae S,Baek C,Shin S.Life cycle CO2 evaluation on reinforced concrete structures with high-strength concrete[J].Environmental Impact Assessment Review,2011,31(3):253-260. Doi:10.1016/j.eiar.2010.07.002.
[3] Gartner E. Industrially interesting approaches to“low-CO2”cements[J].Cement and Concrete Research,2004,34(9):1489-1498. Doi:10.1016/j.cemconres.2004.01.021.
[4] 李兵.低碳建筑技术体系与碳排放测算方法研究[D].武汉:华中科技大学,2012.
Li B.Research on low carbon building technology system and carbon emissions calculation method[D].Wuhan: Huazhong University of Science and Technology,2012.
[5] 谢园方.旅游业碳排放测度与碳减排机制研究——以长三角为例[D].南京:南京师范大学,2012.
Xie Y F.Estimating and carbon emissions reduction mechanism tourism:a case study of the Yangtze River Delta[D]. Nanjing:Nanjing Normal University,2012.
[6] 张德英.我国工业部分碳源排放量估算办法研究[D].北京:北京林业大学,2005.
Zhang D Y.China's industrial sector carbon emissions estimates approachstudy[D]. Beijing:Beijing Forestry University,2005.
[7] IPCC.Climate Change:the IPCC scientific assessment[C]//Houghton J T, Jenkins G J, Ephraim's J,et al.Cambridge:Cambridge University Press,1990.
[8] 娄伟.城市碳排放量测算方法研究——以北京市为例[J].华中科技大学学报(社会科学版),2011,25(3):104-110.
Lou W. Study on measurement methods of city carbon emissions:Beijing as a case[J].Journal of Huazhong University of Science and Technology(Social Science Edition),2011,25(3):104-110.
[9] Lenten M.Primary energy and greenhouse gases embodied in Australian final consumption:an input-output analysis[J].Energy Policy,1998,26(6):495-506. Doi:10.1016/S0301-4215(98)00012-3.
[10] 刘瀚洋,陈步金,赵兵.基于生命周期(LCA)的园林碳排放评价初探[J].中国城市林业,2013,11(6):11-14. Doi:10.3969.j.issn.1672-4925.2013.06.004.
Liu H Y,Chen B J,Zhao B.A study of landscape carbon emission based on life cycle assessment theory[J]. Journal of Chinese Urban Forestry,2013,11(6):11-14.
[11] 张涛,姜裕华,黄有亮,等.建筑中常用的能源与材料的碳排放因子[J].中国建设信息,2010(23):58-59.
Zhang T, Jiang Y H,Huang Y L, et al.Commonly used in building materials and energy carbon emission factor[J].China Construction Information,2010(23):58-59.
[12] 彭文正.以生命周期评估技术应用于建筑耗能之研究[D].台中:台湾朝阳科技大学,2003.
Peng W Z. Life cycle assessment study techniques used in the construction of energy[D].Taizhong:Chaoyang University of Technology in Taiwan,2003.
[13] 建设部标准定额司.全国统一施工机械台班费用定额[EB/OL].(2015-05-28).http//:ziliao.co188.com/p62286410.html.2012.
[14] 赵鸿铎.机场沥青道面结构设计方法与指标探讨[J].中国民航大学学报,2007, 25(5):4-8. Doi:10.3969/j.issn.1001-5590.2007.05.002.
Zhao H D. Study on structure design method and mindexes of airport asphalt pavement[J].Journal of Civil Aviation University of China, 2007, 25(5):4-8.
[15] 朱建宁.减人工之量,增自然之量——风景园林减量设计的内涵与方法[J].中国园林,2013(8):5-8.
[16] 王琳飞,王国兵,沈玉娟,等.国际碳汇市场的补偿标准体系及我国林业碳汇项目实践进展[J]. 南京林业大学学报(自然科学版),2010,35(5):120-124. Doi:10.3969/j.issn.1000-2006.2010.05.026.
Wang L F, Wang G B,Shen Y J,et al.Carbon offset standard system for international carbon sequestration market and the development of forest carbon sequestration projects in China[J]. Journal of Nanjing Forestry University(Natural Sciences Edition), 2010,35(5):120-124.
[17] 朱容庆.重型载重汽车车架轻量化设计研究[D].武汉:武汉理工大学,2006.
Zhu R Q.Heavy-duty truck chassis lightweight design[D]. Wuhan:Wuhan University of Technology,2006.
[18] 冯建江.LWL-80型履带式挖掘装载机在小断面隧洞开挖中的应用[J]. 四川水力发电,2012(2):18-19. Doi:10.3969/j.issn.1001-2184.2012.02.007.
Feng J J. LWL-80 type crawler loaders mining application small tunnel excavation[J].Sichuan Water Power,2012(2):18-19. |