南京林业大学学报(自然科学版) ›› 1998, Vol. 22 ›› Issue (02): 34-38.doi: 10.3969/j.jssn.1000-2006.1998.02.008
• 研究论文 • 上一篇 下一篇
黄新;杨明明;唐桂兰;张大中
出版日期:
发布日期:
Huang Xin Yang Mingming Tang Guilan Zhang Dazhong
Online:
Published:
摘要: <正>为解决四川省二滩水电站木材过坝进口段过木通道端部木材堵塞的问题,进行了拆垛用立柱式滚筒的模型设计和相应的试验,采用这样的措施可以解决这类堵塞的问题
Abstract: The model design and test of vertical drum for breaking jam were made in order to solve the jam problem, which appeared at the front end of floating channel for timber feeding at Ertan Hydroelectric station in Sichuan Province The result showed that this kind facility was able to solve the jam problem of timber
黄新,杨明明,唐桂兰,等. 拆垛用立柱式滚筒模型试验[J]. 南京林业大学学报(自然科学版), 1998, 22(02): 34-38.
Huang Xin Yang Mingming Tang Guilan Zhang Dazhong. THE MODEL TEST OF VERTICAL DRUM FOR BREAKING JAM[J].Journal of Nanjing Forestry University (Natural Science Edition), 1998, 22(02): 34-38.DOI: 10.3969/j.jssn.1000-2006.1998.02.008.
/ 推荐
导出引用管理器 EndNote|Reference Manager|ProCite|BibTeX|RefWorks
链接本文: http://nldxb.njfu.edu.cn/CN/10.3969/j.jssn.1000-2006.1998.02.008
http://nldxb.njfu.edu.cn/CN/Y1998/V22/I02/34