二灰碎石基层施工质量的控制措施

穆传刚,史建华   

  1. 江苏海通建设工程有限公司,江苏连云港222001
  • 出版日期:2016-12-28 发布日期:2016-12-28

Measures for Controlling Construction Quality of Lime-fly Bound Macadam Base of Pavement

MU Chuan-gang,SHI Jian-hua   

  1. Jiangsu IIaitong Construction Engineering Co Ltd, lanyungang 222001 China
  • Online:2016-12-28 Published:2016-12-28

摘要: <正>结合多年的施工经验,从材料选用、配合比设计、铺筑方法等方面分析二灰碎石基层施工中的质量控制措施。结果表明:在摊铺作业时,应保持作业的连续性;在气温较高时施工,应保证碾压时二灰碎石的含水量,并快速摊铺、碾压;施工完毕要保湿养生7d,气温较低时还需采取覆盖措施,防止表面冻坏。

Abstract: The measures for controlling construction quality of lime-fly bound macadam base of pavement were studied from the respects of selecting materials, designing mix proportion and paving methods. The results as follows: the work would be continuous on spreading. In- conditions of high temperature, the moisture content of lime-fly ash bound macadam would be keeped on rolled work doing, and spreading and rolled work would be quick. After rolled work, maintenance would be kept with moisture within 7 days, in conditions of low tempera- ture, road would be covered with material to prevent it frozen.