JOURNAL OF NANJING FORESTRY UNIVERSITY ›› 2004, Vol. 28 ›› Issue (01): 50-52.doi: 10.3969/j.jssn.1000-2006.2004.01.012

Previous Articles     Next Articles

The Influence of the Pavement Construction on the Concrete Boxgirder

XIE Fa-xiang~1,YE Jian-shu~2   

  1. 1.Nanjing Third Yangzi River Bridge Construction Commanding Department,Nanjing 210028,China;2.Southeast University,Nanjing 210096,China
  • Online:2004-02-18 Published:2004-02-18

Abstract: The observation of the pavement construction on a concrete boxgirder bridge is introduced to determine the influence of the construction on the bridge.The comparison between the static computation values and measuring values suggests that the influence of the bridge during the construction procedure is much greater than the static state.It is necessary to reinforce the control of the pavement construction procedure and to do essential calculations in order to minimize the possibility of impairing the structure.

CLC Number: