The Positioning Method Analysis of the Work-boat Wharf Stake at Shanghai International Shipping Center

ZHENG Jia-zhu1, GAO Cheng-fa2

Journal of Nanjing Forestry University (Natural Sciences Edition) ›› 2005, Vol. 29 ›› Issue (06) : 27-30.

PDF(3679095 KB)
PDF(3679095 KB)
Journal of Nanjing Forestry University (Natural Sciences Edition) ›› 2005, Vol. 29 ›› Issue (06) : 27-30. DOI: 10.3969/j.jssn.1000-2006.2005.06.007

The Positioning Method Analysis of the Work-boat Wharf Stake at Shanghai International Shipping Center

  • ZHENG Jia-zhu1, GAO Cheng-fa2
Author information +
History +

Abstract

In this paper, the positioning method and construction control survey of the workboat wharf at the first phase of Shanghai international shipping center was introduced, and the precision of position with this method was analysed. Then the anthor expounds feasibility, advantages and disadvantages of the work-boat wharf stake position with GPS and puts forward some methods to solve these problems.

Cite this article

Download Citations
ZHENG Jia-zhu1, GAO Cheng-fa2. The Positioning Method Analysis of the Work-boat Wharf Stake at Shanghai International Shipping Center[J]. Journal of Nanjing Forestry University (Natural Sciences Edition). 2005, 29(06): 27-30 https://doi.org/10.3969/j.jssn.1000-2006.2005.06.007
PDF(3679095 KB)

Accesses

Citation

Detail

Sections
Recommended
The full text is translated into English by AI, aiming to facilitate reading and comprehension. The core content is subject to the explanation in Chinese.

/