Technology of the steelpylon’s process assembling survey of Nanjing Third Yangzi River Bridge

WEI Haohan1,2,HE Liheng2,SUI Mingming2,GUO Shenfan3   

  1. 1.College of Civil Engineering, Hohai University, Nanjing 210098, China;2.College of Civil Engineering, Nanjing Forestry University, Nanjing 210037, China;3.Nanjing Institute of Surveying Mapping and Geotechnical Investigation Co.Ltd, Nanjing 210005, C
  • Online:2009-02-18 Published:2009-02-18

Abstract: Nanjing Third Yangzi River Bridge was the first cable stayed bridge in China. Its main tower was the form of steel structure. The key technology of the steelpylon’s process assembling was investigated to meet the characteristics of the steelpylon’s construction. The method of the control network’s building for assembling survey was introduced. The inner controlling method and the method combined inner controlling and outer controlling were pointed out. Quality evaluation was made for the assembling surveys’s result. The results showed that the survey methods could meet the requirement of design and construction. It could also be a reference for the similar steelpylon’s engineering projectors.

CLC Number: