JOURNAL OF NANJING FORESTRY UNIVERSITY ›› 2006, Vol. 30 ›› Issue (S1): 109-112.doi: 10.3969/j.jssn.1000-2006.2006.07.033
Previous Articles Next Articles
YOU Yong-jiang,CHENG Jie
Online:
Published:
Abstract: The conception of "Minimum Evaluated Bid Price Method" and the bid evaluation procedure were introduced. The advantage and disadvantage was analyzed. Some suggestions for improving the application of "Minimum Evaluated Bid Price Method" in state road were put forward based on the practice of the bidding activities in highway construction projects. It was proved that "Minimum Evaluated Bid Price Method" was worth spreading while some measures to reduce corresponding risks should be adopted.
CLC Number:
U412.21
YOU Yong-jiang,CHENG Jie. Application of the Minimum Evaluated Bid Price Methodin Highway Construction Bids[J]. JOURNAL OF NANJING FORESTRY UNIVERSITY, 2006, 30(S1): 109-112.
/ Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://nldxb.njfu.edu.cn/EN/10.3969/j.jssn.1000-2006.2006.07.033
http://nldxb.njfu.edu.cn/EN/Y2006/V30/IS1/109