Application of the Minimum Evaluated Bid Price Methodin Highway Construction Bids

YOU Yong-jiang,CHENG Jie

Journal of Nanjing Forestry University (Natural Sciences Edition) ›› 2006, Vol. 30 ›› Issue (S1) : 109-112.

Journal of Nanjing Forestry University (Natural Sciences Edition) ›› 2006, Vol. 30 ›› Issue (S1) : 109-112. DOI: 10.3969/j.jssn.1000-2006.2006.07.033

Application of the Minimum Evaluated Bid Price Methodin Highway Construction Bids

  • YOU Yong-jiang,CHENG Jie
Author information +
History +

Abstract

The conception of "Minimum Evaluated Bid Price Method" and the bid evaluation procedure were introduced. The advantage and disadvantage was analyzed. Some suggestions for improving the application of "Minimum Evaluated Bid Price Method" in state road were put forward based on the practice of the bidding activities in highway construction projects. It was proved that "Minimum Evaluated Bid Price Method" was worth spreading while some measures to reduce corresponding risks should be adopted.

Cite this article

Download Citations
YOU Yong-jiang,CHENG Jie. Application of the Minimum Evaluated Bid Price Methodin Highway Construction Bids[J]. Journal of Nanjing Forestry University (Natural Sciences Edition). 2006, 30(S1): 109-112 https://doi.org/10.3969/j.jssn.1000-2006.2006.07.033

Accesses

Citation

Detail

Sections
Recommended
The full text is translated into English by AI, aiming to facilitate reading and comprehension. The core content is subject to the explanation in Chinese.

/